Low Sulphure Pipes / Eca Modifications by Riding Team

 

 

Work Overview
Vessel Type: Container Ship.
LOA: 293,47 mtrs.
BEAM: 40,06 mtrs.
G.T: 73.934 mt
Year of build: 2007
Port: Riding Squad
Time of execution: 14 days (December 2014)

New pipe lines for L.S. MDO storage/supply to A/E and M/E. MDO coolers installation, booster and circulation pumps exchange. New modified drawings had to be presented to the vessel for class approval.

Working Area:

Engine room piping to connect HFO Tks No8 Port-Stbd with MDO transfer/bunkering line. ME Room

M/E and A/E MDO supply pipes to Coolers. Purifier Room

CFW supply to MDO Coolers. Purifier Room

 

Execution:

Load all material on board by lorry cranes and monorail crane.

Fabrication of new lines as per measurements taken in situ.

Welding all pipes at ER workshop.

Assembling of fabricated pipes in place with adequate accessories.

Pressure testing of new installed lines.

 

Special Characteristics:

Initial drawings were accepted by vessels Class and Owners representative.

Material, consumable and welders certification presented before works commence.

Welders and procedures certified by ABS.